Mon. May 10th, 2021

Reports reaching our news desk say work is in progress at Ngwa road and Obingwa headquarters, Okpu, Imuobo road.

Our Aba Zonal Correspondent, Ngozi Paul Onuoha reports that at Ngwa road, the contractor handling the road project has commenced asphalting work which has covered from St. Joseph School to Number One Ngwa while from Mberi road down to Ngwa by East, grading and construction of drainages are ongoing at both sides of the road.

At Obingwa Headquarters, Okpu Umuobo road, grading and construction of drainage at both sides of the road is also going on.

Some of the people interviewed including Mrs.  Ezinne Edwin, Mr. Okwindu lbe, Mrs. Okwuchi Jude, extolled the State Governor for embarking on the numerous infrastructural development in the State especially in Aba and enjoined the contractors to re-double efforts to deliver the roads before the raining season.

Leave a Reply

Your email address will not be published. Required fields are marked *